Inland port development projects in Ayeyarwaddy River (Pakokku)

Status:
New
Start:
FY2020-2021
End:
FY2023-2024

Sectors

Water resources conservation (including data collection)

Project Description

The project will involve upgrading of river port facilities in Pakokku Port in Pakokku, which is one of a largest cities in Magway Region. It is situated about 30 km north-east of Bagan on the Ayeyarwady River. The Ayeyarwady River is the largest river in Myanmar and is considered a major transportation system both in terms of volume of goods and population served.

Pakokku’s strategic location in Central Myanmar makes it an important hub for transport of people and goods. It is connected to other parts of the country and to China, Thailand and India by multiple modes of transportation. Pakokku Bridge is part of the India–Myanmar–Thailand Trilateral Highway and is one the longest bridges in Myanmar.

The development of Pakokku Inland Port aims to improve efficiency in transportation, facilitate effective cargo handling with mechanical loading equipment, and activate new transport demand and inland transport business.

Currently, Pakokku Port has manual facilities and could not handle big cargo because of lack of modern equipment. Given increasing population, and economic development of Pakokku Division and the surrounding areas, an inland port with modern equipment and machinery will be essential to facilitate large amount of cargo flow. Use of mechanical equipment and introduction of palletized cargo and containerized cargo system will facilitate efficient and cost-effective cargo handling.

Project Expected Benefits

The project will play a vital role in economic development of the country by promoting efficient cargo handling and containerization, supporting facilitation of inland water transport which has lower greenhouse gas emission per unit of transport volume than that of road transport, creating job opportunities for local people, and enhancing competitiveness of economic zones and industrial zones in the area. It will also facilitate lower consumer prices of goods due to reduced cost of transport for cargo switching from road to river; savings in idle vessel time at berths with faster loading and unloading; savings in loss and damage to cargo; and safer and more reliable cargo handling. The development of Pakokku Inland Port will benefit the people along the Ayeyarwady River especially those in Pakokku Division. People from Mandalay, Yangon, Bago and Sagaing will also benefit from containerized shipping upon completion of this project. Efficient and cost-effective cargo transportation to other areas in the country will further reform the trade sector, and will strengthen regional and international cooperation and linkages.

Locations

Ayeyarwady Region; Bago Region; Kachin State; Magway Region

Total Project Cost

46.93M

Financing Type

Inviting Additional Financing

Implementing Government Agency

Directorate of Water Resources and Improvement of River Systems, Ministry of Transport and Communications

Myanmar Sustainable Development Plan Alignment

Contact Detail

Toe Aung Lin
Director/Directorate of Water Resources and Improvement of River Systems, Ministry of Transport and Communications
dwir7.npt@gmail.com