Hazardous Waste Treatment Plant Project

Status:
Project Concept Development
Start:
FY2020-2021
End:
FY2023-2024

Project Description

The project will involve establishment and operation of a hazardous waste treatment plant to process industrial wastes from Yangon industrial estates that can be recycled or disposed to landfills. The project, which will be implemented through a public-private partnership (PPP) scheme, will include the following components: construction of treatment plants for solid, liquid and chemical wastes; construction of waste storage yard; and installation of recycling machineries.

Wastes that come out of industrial zones in Hlaing Tharyar, Shwe Linban and Mingalardon, and from Thilawa Special Economic Zone will be collected in storage yards and processed in the hazardous waste treatment plant. Wastes materials such as bottles, paper, plastics, electronic parts, glass, metals, etc. can be recycled and substituted for industrial raw materials.

Project Expected Benefits

The project will reduce volume of waste materials to be disposed, and reduce costs for purchasing raw materials and new products. Recycling materials such as aluminum cans and plastic bottles can mean less air, water and soil pollution associated with the extraction, refining and processing of raw materials. The recycling business will also create employment and promote sustainable use of resources.

Locations

Yangon Region

Total Project Cost

50.00M

Financing Type

Private Sector Financing

Implementing Government Agency

No. (3) Heavy Industrial Enterprise

Myanmar Sustainable Development Plan Alignment

Contact Detail

U Mg Mg Thant
General Manager/Technology Development Department, No(3) Heavy Industrial Enterprise
mpcipl@gmail.com