The project is aimed at increasing transmission capacity, and improving stability and system reliability along the national grid.
Key project activities include preliminary survey for study for transmission line route, feasibility study, tendering and procurement; EPC contracting, detailed survey for tower plotting; detailed design for line material and substation; and supply of material and construction, and testing and commissioning.
Bago Region; Kayah State; Mandalay Region; Nay Pyi Taw Union Territory; Shan State
Total Project Cost
Financing Type
Implementing Government Agency
Donors
Developer Name
| Description | The project is aimed at increasing transmission capacity, and improving stability and system reliability along the national grid. Key project activities include preliminary survey for study for transmission line route, feasibility study, tendering and procurement; EPC contracting, detailed survey for tower plotting; detailed design for line material and substation; and supply of material and construction, and testing and commissioning. |
||
| Expected Benefits | The project is expected to provide reliable power supply nationwide, especially to those living in remote areas that are currently without electricity. It is also envisioned to increase employment opportunities, boost productivity and facilitate emergence of new small and medium enterprises. | ||
| Implementing Government Agency | Department of Electric Power Transmission and System Control, Ministry of Electricity and Energy | Donors | China EXIM Bank |
| Total Project Cost | $ 160.37M | ||
| လုပ်ငန်းအဆင့် | — | Implementation Period | FY2012-2013 - FY2022-2023 |
| Ministry | Ministry of Electricity and Energy | ||
| Location |
Bago Region; Kayah State; Mandalay Region; Nay Pyi Taw Union Territory; Shan State
📍 Loading map...
|
||
| Contact |
U Aye Kyaw Director General / Department of Power Transmission and System Control,Ministry of Electricity and Energy Ministry of Electricity and Energy 067 3410442, 067 3410218 dg.dptsc@gmail.com |
||