National Power Transmission Network Development Project(Phase 2) (JICA loan) (500kv Phayagyi-West University (Hlaingtharyar) Transmission Line(60) Miles and related substation)

Status:
Implementation
Start:
FY2018-2019
End:
FY2022-2023

Sectors

Electrical transmission/ distribution

Project Description

The project involves construction of the Phayagyi 500/230 kV Substation, Hlaingtharyar 500/230 kV Substation, and a 500-kV transmission line from Phayagyi to Hlaingtharyar. It is aimed at increasing transmission capacity and improving system reliability along the national grid.

Project Expected Benefits

The project is expected to provide reliable power supply nationwide, especially to those living in remote areas that are currently without electricity. It is also envisioned to increase employment opportunities, boost productivity and facilitate emergence of new small and medium enterprises.

Locations

Hlaingtharya Township, Yangon Region
Bago Township, Bago Region

Total Project Cost

417.57M

Financing Type

Development Assistance

Implementing Government Agency

Department of Electric Power Transmission and System Control, Ministry of Electricity and Energy

Donors

Japan International Coorperation Agency