The project involves establishment of a new port equipped with container storage facility, a cargo storage warehouse, pier bridges, approach bridges, and modern machinery to load cargo on ships. Mechanical equipment handling will be introduced to enable quick processing of heavy cargo that could not be handled by conventional manpower handling.
The port will be built on 8.1 hectares of land located one kilometre west of Mandalay City, behind the city’s circular road and Shwe Lone Bo Monastery.
It is aimed at improving trade and transportation along inland waterways. Years of underinvestment have reduced effectiveness of Myanmar’s inland port system. Modernization of inland port infrastructure will be essential to facilitate increased cargo flows along the Ayeyarwady River. Although trade is conducted with other cities via water routes from Mandalay, loading and unloading of cargo along the river is still being done manually rather than by machine due to lack of modern equipment in existing port facilities along the Ayeyarwady River. Mandalay’s strategic location in Central Myanmar makes it an important hub for transport of people and goods. The city is connected to other parts of the country and to China and India through multiple modes of transportation.
Mandalay Region
Total Project Cost
Financing Type
Implementing Government Agency
Donors
| Description | The project involves establishment of a new port equipped with container storage facility, a cargo storage warehouse, pier bridges, approach bridges, and modern machinery to load cargo on ships. Mechanical equipment handling will be introduced to enable quick processing of heavy cargo that could not be handled by conventional manpower handling. The port will be built on 8.1 hectares of land located one kilometre west of Mandalay City, behind the city’s circular road and Shwe Lone Bo Monastery. It is aimed at improving trade and transportation along inland waterways. Years of underinvestment have reduced effectiveness of Myanmar’s inland port system. Modernization of inland port infrastructure will be essential to facilitate increased cargo flows along the Ayeyarwady River. Although trade is conducted with other cities via water routes from Mandalay, loading and unloading of cargo along the river is still being done manually rather than by machine due to lack of modern equipment in existing port facilities along the Ayeyarwady River. Mandalay's strategic location in Central Myanmar makes it an important hub for transport of people and goods. The city is connected to other parts of the country and to China and India through multiple modes of transportation. |
||
| Expected Benefits | The project will facilitate effective and safe cargo handling, improve quality and efficiency of transportation by introducing palletized and containerized cargo, and create new inland transport businesses. It will likewise reduce transportation cost, which would then trigger greater export of local products. The project is also expected to have ripple effect on other local river ports (i.e. local river ports will be similarly developed as the Mandalay Port). | ||
| Implementing Government Agency | Directorate of Water Resources and Improvement of River Systems, Ministry of Transport and Communications | Donors | Japan International Coorperation Agency |
| Total Project Cost | $ 56.12M | ||
| လုပ်ငန်းအဆင့် | — | Implementation Period | FY2018-2019 - FY2021-2022 |
| Ministry | Ministry of Transport and Communications | ||
| Location |
Mandalay Region
📍 Loading map...
|
||
| Sector Categories | Water transport | ||
| Contact |
U Toe Aung Lin Director / Directorate of Water Resources and Improvement of River Systems (DWIR) Ministry of Transport and Communications dwir7.npt@gmail.com |
||