Improvement of Transmission Efficiency Project / Magway-Shwetaung20” Gas Pipeline Replacement Project

Status:
Contract / Negotiation of Contract
Start:
FY2020-2021
End:
FY2023-2024

Sectors

Gas distribution

Project Description

The project will involve replacement of gas pipelines running from Magway to Shwetaung. Detailed scope of works includes:

1. replacement of existing deteriorated 119-mile long, 14-inch gas pipeline in Magway Region and Bago Region (Magway–Shwetaung portion) with 20-inch, three (3) layer side extruded polyethylene (“3LPE”) coated carbon steel pipe;

2. replacement of existing deteriorated 14-mile long, 10-inch gas pipeline (Titut–Kyawswar Fertilizer Plant) with 10-inch, 3LPE coated carbon steel pipe; and

3. replacement of existing deteriorated 8-mile long, 8-inch gas pipeline (Aung Myin Barhu Valve Junction– Shwetaung Gas Turbine) with 8-inch, 3LPE coated carbon steel pipe.

The proposed 20-inch gas pipeline network connecting the upper and lower parts of the country is expected to help increase power generation capacity at Shwe Taung gas turbine by 70 megawatts.

Project Expected Benefits

Replacement of an approximately 141-mile (228-km) gas transmission pipeline from Magway to Shwetaung will increase natural gas supply for domestic use and improve power supply reliability. It will support local and regional economic growth and poverty reduction by enhancing productivity, promoting industrialization and creating jobs and other livelihood opportunities.

Locations

Magway Region
Bago Region

Total Project Cost

129.50M

Financing Type

Public Domestic Financing, Development Assistance

Implementing Government Agency

Myanma Oil & Gas Enterprise

Myanmar Sustainable Development Plan Alignment

Contact Detail

Zaw Htun
Chief Engineer/Myanma Oil and Gas Enterprise(MOGE),Ministry of Electricity and Energy(MOEE)
zawhtunzaw@gmail.com