{"id":911,"date":"2026-05-26T14:40:53","date_gmt":"2026-05-26T08:10:53","guid":{"rendered":"https:\/\/projectbank.aggademo.com\/?post_type=project_proposal&#038;p=911"},"modified":"2026-08-03T14:51:43","modified_gmt":"2026-08-03T08:21:43","slug":"wartaya-pv-power-agriculture-project-100-mw-phase-1-30-mw-phase-2-70-mw","status":"publish","type":"project_proposal","link":"https:\/\/www.projectbank.gov.mm\/my\/project-proposal\/wartaya-pv-power-agriculture-project-100-mw-phase-1-30-mw-phase-2-70-mw\/","title":{"rendered":"Wartaya PV Power + Agriculture Project (100 MW) (Phase 1 (30 MW), Phase 2 (70 MW))"},"content":{"rendered":"","protected":false},"template":"","categories":[],"tags":[24],"class_list":["post-911","project_proposal","type-project_proposal","status-publish","hentry","tag-previous-data"],"contact_person_name":"Mi Mi Khaing","project_id":"PB-ID-1210","date_created":"2020-05-20","position_department":"Director General \/ Department of Electric Power Planning (DEPP), Ministry of Electricity and Energy (MOEE)","date_last_modified":"2020-08-05","phone_number":"067 3410203","address":"","project_name_myanmar":"Wartaya PV Power + Agriculture Project (100 MW) (Phase 1 (30 MW), Phase 2 (70 MW))","email":"depmmk@gmail.com","project_name_en":"Wartaya PV Power + Agriculture Project (100 MW) (Phase 1 (30 MW), Phase 2 (70 MW))","project_description_english":"The proposed power and agriculture project involves establishment of a solar photovoltaic (PV) power plant in Hlaingtharyar Township, Yangon Region, which is approximately 10.5 kilometers away from the downtown of Yangon City. It will have an installed capacity of 100 megawatts (MW) and average annual generation of 221 gigawatt hours (GWh).\r\n\r\nThis project that will be connected to the national grid after completion will supply electricity to the people in Yangon Region especially during the summer season; and use globally leading technologies, practices and experience in PV power development.\r\n\r\nThe on-grid project aims to contribute to fulfillment of Myanmar\u2019s rapidly growing electricity demand, and facilitate achievement of the target electrification of the whole country by the year 2029-2030.","website":"","project_description_myanmar":"The proposed power and agriculture project involves establishment of a solar photovoltaic (PV) power plant in Hlaingtharyar Township, Yangon Region, which is approximately 10.5 kilometers away from the downtown of Yangon City. It will have an installed capacity of 100 megawatts (MW) and average annual generation of 221 gigawatt hours (GWh).\r\n\r\nThis project that will be connected to the national grid after completion will supply electricity to the people in Yangon Region especially during the summer season; and use globally leading technologies, practices and experience in PV power development.\r\n\r\nThe on-grid project aims to contribute to fulfillment of Myanmar\u2019s rapidly growing electricity demand, and facilitate achievement of the target electrification of the whole country by the year 2029-2030.","expected_outputs":"The project will not only promote clean and affordable energy using natural resources but also create job opportunities for the local people during construction stage until operation stage; improve social, economic and educational status; and raise living standards. Aside from supporting achievement of solar targets, it is expected to enhance productivity of the agriculture sector and improve income of farmers whose normal farming activities will continue below the solar panels.","expected_outputs_myanmar":"The project will not only promote clean and affordable energy using natural resources but also create job opportunities for the local people during construction stage until operation stage; improve social, economic and educational status; and raise living standards. Aside from supporting achievement of solar targets, it is expected to enhance productivity of the agriculture sector and improve income of farmers whose normal farming activities will continue below the solar panels.","project_status":"New","start_fiscal_year":"FY2020-2021","funding_sources":"Private Sector Financing","financing_information":"Called for tender on 18\/05\/2020","tender_date":"0000-00-00","developer_name":"","implementing_agency":"Department of Electric Power Planning, Ministry of Electricity and Energy","implementing_agency_myanmar":"\u101c\u103b\u103e\u1015\u103a\u1005\u1005\u103a\u1005\u103d\u1019\u103a\u1038\u1021\u102c\u1038\u1005\u102e\u1019\u1036\u101b\u1031\u1038\u1026\u1038\u1005\u102e\u1038\u100c\u102c\u1014, \u101c\u103b\u103e\u1015\u103a\u1005\u1005\u103a\u1014\u103e\u1004\u1037\u103a \u1005\u103d\u1019\u103a\u1038\u1021\u1004\u103a\u101d\u1014\u103a\u1000\u103c\u102e\u1038\u100c\u102c\u1014","ministry":"Ministry of Electricity and Energy","project_location":"Yangon Region","project_location_myanmar":"\u101c\u103e\u102d\u102f\u1004\u103a\u101e\u102c\u101a\u102c, \u101b\u1014\u103a\u1000\u102f\u1014\u103a\u1010\u102d\u102f\u1004\u103a\u1038\u1012\u1031\u101e\u1000\u103c\u102e\u1038","townships":"Hlaingtharya Township","townships_myanmar":"\u101c\u103e\u102d\u102f\u1004\u103a\u101e\u102c\u101a\u102c,","sector_categories":"Energy generation and supply","sectors":"Solar energy","msdp_alignment":"2.5: Enhancing the efficiency and competitiveness of State Economic Enterprises; 3.6: Build a priority infrastructure base that facilitates sustainable growth and economic diversification; 5.6: Manage cities, towns, historical and cultural centers efficiently and sustainably; 5.2: Increase climate change resilience, reduce exposure to disasters and shocks while protecting livelihoods, and facilitate a shift to a low-carbon growth pathway; 1.2: Promote equitable and conflict-sensitive socio-economic development throughout all States and Regions; 5.1: Ensure a clean environment together with healthy and functioning ecosystems; 5.4: Provide affordable and reliable energy to populations and industries via an appropriate energy generation mix","national_policies":"","national_strategies_and_objectives":"","sdgs_goals":"","state_and_international_cooperation_frameworks":"","goal_1_old_project":"","goal_2_old_project":"2.5: Enhancing the efficiency and competitiveness of State Economic Enterprises;","goal_3_old_project":"3.6: Build a priority infrastructure base that facilitates sustainable growth and economic diversification;","goal_4_old_project":"","goal_5_old_project":"5.6: Manage cities, towns, historical and cultural centers efficiently and sustainably; 5.2: Increase climate change resilience, reduce exposure to disasters and shocks while protecting livelihoods, and facilitate a shift to a low-carbon growth pathway; 1.2: Promote equitable and conflict-sensitive socio-economic development throughout all States and Regions; 5.1: Ensure a clean environment together with healthy and functioning ecosystems; 5.4: Provide affordable and reliable energy to populations and industries via an appropriate energy generation mix","_links":{"self":[{"href":"https:\/\/www.projectbank.gov.mm\/my\/wp-json\/wp\/v2\/project_proposal\/911","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.projectbank.gov.mm\/my\/wp-json\/wp\/v2\/project_proposal"}],"about":[{"href":"https:\/\/www.projectbank.gov.mm\/my\/wp-json\/wp\/v2\/types\/project_proposal"}],"version-history":[{"count":2,"href":"https:\/\/www.projectbank.gov.mm\/my\/wp-json\/wp\/v2\/project_proposal\/911\/revisions"}],"predecessor-version":[{"id":1167,"href":"https:\/\/www.projectbank.gov.mm\/my\/wp-json\/wp\/v2\/project_proposal\/911\/revisions\/1167"}],"wp:attachment":[{"href":"https:\/\/www.projectbank.gov.mm\/my\/wp-json\/wp\/v2\/media?parent=911"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.projectbank.gov.mm\/my\/wp-json\/wp\/v2\/categories?post=911"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.projectbank.gov.mm\/my\/wp-json\/wp\/v2\/tags?post=911"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}