{"id":906,"date":"2026-05-26T14:40:48","date_gmt":"2026-05-26T08:10:48","guid":{"rendered":"https:\/\/projectbank.aggademo.com\/?post_type=project_proposal&#038;p=906"},"modified":"2026-08-03T14:53:03","modified_gmt":"2026-08-03T08:23:03","slug":"nabuaing-solar-power-project-150-mw-phase-1-25-mw-and-other-phases-125-mw","status":"publish","type":"project_proposal","link":"https:\/\/www.projectbank.gov.mm\/my\/project-proposal\/nabuaing-solar-power-project-150-mw-phase-1-25-mw-and-other-phases-125-mw\/","title":{"rendered":"Nabuaing Solar Power Project (150 MW) (Phase 1 25 MW and Other Phases 125 MW)"},"content":{"rendered":"","protected":false},"template":"","categories":[],"tags":[24],"class_list":["post-906","project_proposal","type-project_proposal","status-publish","hentry","tag-previous-data"],"contact_person_name":"Mi Mi Khaing","project_id":"PB-ID-1209","date_created":"2020-05-20","position_department":"Director General \/ Department of Electric Power Planning ,Ministry of Electricity and Energy","date_last_modified":"2020-08-05","phone_number":"067 3410203","address":"Building No. 27, Ministry of Electricity and Energy, Nay Pyi Taw","project_name_myanmar":"Nabuaing Solar Power Project (150 MW) (Phase 1 25 MW and Other Phases 125 MW)","email":"depmmk@gmail.com","project_name_en":"Nabuaing Solar Power Project (150 MW) (Phase 1 25 MW and Other Phases 125 MW)","project_description_english":"The proposed project involves establishment of a solar photovoltaic (PV) power plant in Nabuaing Township, Myingyan District, Mandalay Region with an installed capacity of 150 megawatts (MW) and average annual generation of 305 gigawatt hours (GWh).\r\n\r\nThe Nabuaing Solar PV Power Plant will interconnect with the grid through a 132 kV double circuit, single conductor transmission line into the existing Myingyan 132 kV substation located in Myingyan, Mandalay Division, which is approximately 27 miles from the Nabuaing site location.\r\n\r\nThis grid-connected solar PV power plant will supply electricity to the people in Mandalay Region especially during the dry season; and use globally leading technologies, practices and experience in solar power development.\r\n\r\nThe Memorandum of Agreement and Power Purchase Agreement had been already signed in 2014 and 2016, respectively. The Environmental and Social Impact Assessment Report was approved by the Ministry of Natural Resources and Environmental Conservation in 2018.\r\n\r\nThe project aims to contribute to fulfillment of Myanmar\u2019s rapidly growing electricity demand, and facilitate achievement of the target electrification of the whole country by the year 2029-2030. It will also help achieve the United Nations Sustainable Development Goal 7: Affordable and Clean Energy.","website":"","project_description_myanmar":"The proposed project involves establishment of a solar photovoltaic (PV) power plant in Nabuaing Township, Myingyan District, Mandalay Region with an installed capacity of 150 megawatts (MW) and average annual generation of 305 gigawatt hours (GWh).\r\n\r\nThe Nabuaing Solar PV Power Plant will interconnect with the grid through a 132 kV double circuit, single conductor transmission line into the existing Myingyan 132 kV substation located in Myingyan, Mandalay Division, which is approximately 27 miles from the Nabuaing site location.\r\n\r\nThis grid-connected solar PV power plant will supply electricity to the people in Mandalay Region especially during the dry season; and use globally leading technologies, practices and experience in solar power development.\r\n\r\nThe Memorandum of Agreement and Power Purchase Agreement had been already signed in 2014 and 2016, respectively. The Environmental and Social Impact Assessment Report was approved by the Ministry of Natural Resources and Environmental Conservation in 2018.\r\n\r\nThe project aims to contribute to fulfillment of Myanmar\u2019s rapidly growing electricity demand, and facilitate achievement of the target electrification of the whole country by the year 2029-2030. It will also help achieve the United Nations Sustainable Development Goal 7: Affordable and Clean Energy.","expected_outputs":"The project will not only promote clean and affordable energy using natural resources but also create job opportunities for the local people during construction stage until operation stage; improve social, economic and educational status; and raise living standards. It is also expected to enhance productivity of the industrial sector and competitiveness of the private sector.","expected_outputs_myanmar":"The project will not only promote clean and affordable energy using natural resources but also create job opportunities for the local people during construction stage until operation stage; improve social, economic and educational status; and raise living standards. It is also expected to enhance productivity of the industrial sector and competitiveness of the private sector.","project_status":"Contract \/ Negotiation of Contract","start_fiscal_year":"FY2019-2020","funding_sources":"Private Sector Financing","financing_information":"Finalizing PPA","tender_date":"0000-00-00","developer_name":"","implementing_agency":"Department of Electric Power Planning, Ministry of Electricity and Energy","implementing_agency_myanmar":"\u101c\u103b\u103e\u1015\u103a\u1005\u1005\u103a\u1005\u103d\u1019\u103a\u1038\u1021\u102c\u1038\u1005\u102e\u1019\u1036\u101b\u1031\u1038\u1026\u1038\u1005\u102e\u1038\u100c\u102c\u1014, \u101c\u103b\u103e\u1015\u103a\u1005\u1005\u103a\u1014\u103e\u1004\u1037\u103a \u1005\u103d\u1019\u103a\u1038\u1021\u1004\u103a\u101d\u1014\u103a\u1000\u103c\u102e\u1038\u100c\u102c\u1014","ministry":"Ministry of Electricity and Energy","project_location":"Mandalay Region","project_location_myanmar":"\u1019\u103c\u1004\u103a\u1038\u1001\u103c\u1036, \u1019\u1014\u1039\u1010\u101c\u1031\u1038\u1010\u102d\u102f\u1004\u103a\u1038\u1012\u1031\u101e\u1000\u103c\u102e\u1038","townships":"Myingyan Township","townships_myanmar":"\u1019\u103c\u1004\u103a\u1038\u1001\u103c\u1036,","sector_categories":"Energy generation and supply","sectors":"Solar energy","msdp_alignment":"2.5: Enhancing the efficiency and competitiveness of State Economic Enterprises; 3.6: Build a priority infrastructure base that facilitates sustainable growth and economic diversification; 5.6: Manage cities, towns, historical and cultural centers efficiently and sustainably; 5.2: Increase climate change resilience, reduce exposure to disasters and shocks while protecting livelihoods, and facilitate a shift to a low-carbon growth pathway; 1.2: Promote equitable and conflict-sensitive socio-economic development throughout all States and Regions; 5.1: Ensure a clean environment together with healthy and functioning ecosystems; 5.4: Provide affordable and reliable energy to populations and industries via an appropriate energy generation mix","national_policies":"","national_strategies_and_objectives":"","sdgs_goals":"","state_and_international_cooperation_frameworks":"","goal_1_old_project":"","goal_2_old_project":"2.5: Enhancing the efficiency and competitiveness of State Economic Enterprises;  1.2: Promote equitable and conflict-sensitive socio-economic development throughout all States and Regions;","goal_3_old_project":"3.6: Build a priority infrastructure base that facilitates sustainable growth and economic diversification;","goal_4_old_project":"","goal_5_old_project":"5.6: Manage cities, towns, historical and cultural centers efficiently and sustainably; 5.2: Increase climate change resilience, reduce exposure to disasters and shocks while protecting livelihoods, and facilitate a shift to a low-carbon growth pathway;  5.1: Ensure a clean environment together with healthy and functioning ecosystems; 5.4: Provide affordable and reliable energy to populations and industries via an appropriate energy generation mix","_links":{"self":[{"href":"https:\/\/www.projectbank.gov.mm\/my\/wp-json\/wp\/v2\/project_proposal\/906","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.projectbank.gov.mm\/my\/wp-json\/wp\/v2\/project_proposal"}],"about":[{"href":"https:\/\/www.projectbank.gov.mm\/my\/wp-json\/wp\/v2\/types\/project_proposal"}],"version-history":[{"count":2,"href":"https:\/\/www.projectbank.gov.mm\/my\/wp-json\/wp\/v2\/project_proposal\/906\/revisions"}],"predecessor-version":[{"id":1407,"href":"https:\/\/www.projectbank.gov.mm\/my\/wp-json\/wp\/v2\/project_proposal\/906\/revisions\/1407"}],"wp:attachment":[{"href":"https:\/\/www.projectbank.gov.mm\/my\/wp-json\/wp\/v2\/media?parent=906"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.projectbank.gov.mm\/my\/wp-json\/wp\/v2\/categories?post=906"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.projectbank.gov.mm\/my\/wp-json\/wp\/v2\/tags?post=906"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}