{"id":880,"date":"2026-05-25T16:17:39","date_gmt":"2026-05-25T09:47:39","guid":{"rendered":"https:\/\/projectbank.aggademo.com\/?post_type=project_proposal&#038;p=880"},"modified":"2026-08-03T17:10:23","modified_gmt":"2026-08-03T10:40:23","slug":"improvement-of-transmission-efficiency-project-magway-shwetaung20-gas-pipeline-replacement-project","status":"publish","type":"project_proposal","link":"https:\/\/www.projectbank.gov.mm\/my\/project-proposal\/improvement-of-transmission-efficiency-project-magway-shwetaung20-gas-pipeline-replacement-project\/","title":{"rendered":"Improvement of Transmission Efficiency Project \/ Magway-Shwetaung20\u201d Gas Pipeline Replacement Project"},"content":{"rendered":"","protected":false},"template":"","categories":[],"tags":[24],"class_list":["post-880","project_proposal","type-project_proposal","status-publish","hentry","tag-previous-data"],"contact_person_name":"Zaw Htun","project_id":"PB-ID-1182","date_created":"2020-05-19","position_department":"Chief Engineer\/Myanma Oil and Gas Enterprise(MOGE),Ministry of Electricity and Energy(MOEE)","date_last_modified":"2020-11-16","phone_number":"","address":"Building No.44, Engineering Department, MOGE,  NayPyi Taw","project_name_myanmar":"Improvement of Transmission Efficiency Project \/ Magway-Shwetaung20\u201d Gas Pipeline Replacement Project","email":"zawhtunzaw@gmail.com","project_name_en":"Improvement of Transmission Efficiency Project \/ Magway-Shwetaung20\u201d Gas Pipeline Replacement Project","project_description_english":"The project will involve replacement of gas pipelines running from Magway to Shwetaung. Detailed scope of works includes:\r\n\r\n1. replacement of existing deteriorated 119-mile long, 14-inch gas pipeline in Magway Region and Bago Region (Magway\u2013Shwetaung portion) with 20-inch, three (3) layer side extruded polyethylene (\u201c3LPE\u201d) coated carbon steel pipe;\r\n\r\n2. replacement of existing deteriorated 14-mile long, 10-inch gas pipeline (Titut\u2013Kyawswar Fertilizer Plant) with 10-inch, 3LPE coated carbon steel pipe; and\r\n\r\n3. replacement of existing deteriorated 8-mile long, 8-inch gas pipeline (Aung Myin Barhu Valve Junction\u2013 Shwetaung Gas Turbine) with 8-inch, 3LPE coated carbon steel pipe.\r\n\r\nThe proposed 20-inch gas pipeline network connecting the upper and lower parts of the country is expected to help increase power generation capacity at Shwe Taung gas turbine by 70 megawatts.","website":"","project_description_myanmar":"The project will involve replacement of gas pipelines running from Magway to Shwetaung. Detailed scope of works includes:\r\n\r\n1. replacement of existing deteriorated 119-mile long, 14-inch gas pipeline in Magway Region and Bago Region (Magway\u2013Shwetaung portion) with 20-inch, three (3) layer side extruded polyethylene (\u201c3LPE\u201d) coated carbon steel pipe;\r\n\r\n2. replacement of existing deteriorated 14-mile long, 10-inch gas pipeline (Titut\u2013Kyawswar Fertilizer Plant) with 10-inch, 3LPE coated carbon steel pipe; and\r\n\r\n3. replacement of existing deteriorated 8-mile long, 8-inch gas pipeline (Aung Myin Barhu Valve Junction\u2013 Shwetaung Gas Turbine) with 8-inch, 3LPE coated carbon steel pipe.\r\n\r\nThe proposed 20-inch gas pipeline network connecting the upper and lower parts of the country is expected to help increase power generation capacity at Shwe Taung gas turbine by 70 megawatts.","expected_outputs":"Replacement of an approximately 141-mile (228-km) gas transmission pipeline from Magway to Shwetaung will increase natural gas supply for domestic use and improve power supply reliability. It will support local and regional economic growth and poverty reduction by enhancing productivity, promoting industrialization and creating jobs and other livelihood opportunities.","expected_outputs_myanmar":"Replacement of an approximately 141-mile (228-km) gas transmission pipeline from Magway to Shwetaung will increase natural gas supply for domestic use and improve power supply reliability. It will support local and regional economic growth and poverty reduction by enhancing productivity, promoting industrialization and creating jobs and other livelihood opportunities.","project_status":"Contract \/ Negotiation of Contract","start_fiscal_year":"FY2020-2021","funding_sources":"Public Domestic Financing, Development Assistance","financing_information":"","tender_date":"0000-00-00","developer_name":"","implementing_agency":"Myanma Oil & Gas Enterprise","implementing_agency_myanmar":"\u1019\u103c\u1014\u103a\u1019\u102c\u1037\u101b\u1031\u1014\u1036\u1014\u103e\u1004\u1037\u103a \u101e\u1018\u102c\u101d\u1013\u102c\u1010\u103a\u1004\u103d\u1031\u1037\u101c\u102f\u1015\u103a\u1004\u1014\u103a\u1038, \u101c\u103b\u103e\u1015\u103a\u1005\u1005\u103a\u1014\u103e\u1004\u1037\u103a \u1005\u103d\u1019\u103a\u1038\u1021\u1004\u103a\u101d\u1014\u103a\u1000\u103c\u102e\u1038\u100c\u102c\u1014","ministry":"Ministry of Electricity and Energy","project_location":"Magway Region\r\nBago Region","project_location_myanmar":"\u1019\u1000\u103d\u1031\u1038\u1010\u102d\u102f\u1004\u103a\u1038\u1012\u1031\u101e\u1000\u103c\u102e\u1038\r\n\u1015\u1032\u1001\u1030\u1038\u1010\u102d\u102f\u1004\u103a\u1038\u1012\u1031\u101e\u1000\u103c\u102e\u1038","townships":"","townships_myanmar":"","sector_categories":"Energy generation and supply","sectors":"Gas distribution","msdp_alignment":"3.6: Build a priority infrastructure base that facilitates sustainable growth and economic diversification; 5.4: Provide affordable and reliable energy to populations and industries via an appropriate energy generation mix","national_policies":"","national_strategies_and_objectives":"","sdgs_goals":"","state_and_international_cooperation_frameworks":"","goal_1_old_project":"","goal_2_old_project":"","goal_3_old_project":"3.6: Build a priority infrastructure base that facilitates sustainable growth and economic diversification;","goal_4_old_project":"","goal_5_old_project":"5.4: Provide affordable and reliable energy to populations and industries via an appropriate energy generation mix","_links":{"self":[{"href":"https:\/\/www.projectbank.gov.mm\/my\/wp-json\/wp\/v2\/project_proposal\/880","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.projectbank.gov.mm\/my\/wp-json\/wp\/v2\/project_proposal"}],"about":[{"href":"https:\/\/www.projectbank.gov.mm\/my\/wp-json\/wp\/v2\/types\/project_proposal"}],"version-history":[{"count":2,"href":"https:\/\/www.projectbank.gov.mm\/my\/wp-json\/wp\/v2\/project_proposal\/880\/revisions"}],"predecessor-version":[{"id":884,"href":"https:\/\/www.projectbank.gov.mm\/my\/wp-json\/wp\/v2\/project_proposal\/880\/revisions\/884"}],"wp:attachment":[{"href":"https:\/\/www.projectbank.gov.mm\/my\/wp-json\/wp\/v2\/media?parent=880"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.projectbank.gov.mm\/my\/wp-json\/wp\/v2\/categories?post=880"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.projectbank.gov.mm\/my\/wp-json\/wp\/v2\/tags?post=880"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}