{"id":1094,"date":"2026-05-26T14:08:25","date_gmt":"2026-05-26T07:38:25","guid":{"rendered":"https:\/\/projectbank.aggademo.com\/?post_type=project_proposal&#038;p=1094"},"modified":"2026-08-03T16:04:09","modified_gmt":"2026-08-03T09:34:09","slug":"enhancing-transport-navigability-in-ayeyarwady-river","status":"publish","type":"project_proposal","link":"https:\/\/www.projectbank.gov.mm\/my\/project-proposal\/enhancing-transport-navigability-in-ayeyarwady-river\/","title":{"rendered":"Enhancing Transport Navigability in Ayeyarwady River"},"content":{"rendered":"","protected":false},"template":"","categories":[],"tags":[24],"class_list":["post-1094","project_proposal","type-project_proposal","status-publish","hentry","tag-previous-data"],"contact_person_name":"U Toe Aung Lin","project_id":"PB-ID-1160","date_created":"2020-02-19","position_department":"Director\/Directorate of Water Resources and Improvement of River Systems","date_last_modified":"2020-09-08","phone_number":"","address":"Office Building No. (5), Directorate of Water Resources and Improvement of River Systems (DWIR), Ministry of Transport and Communications, Naypyitaw, Myanmar","project_name_myanmar":"Enhancing Transport Navigability in Ayeyarwady River","email":"kotoegyi.dwir5@gmail.com","project_name_en":"Enhancing Transport Navigability in Ayeyarwady River","project_description_english":"The project is aimed at enhancing navigation conditions along the Ayeyarwady River. It involves dredging, using riverbank training structures and stabilizing banks to make the main flow of water become concentrated and maintain an increased depth through natural erosion.\r\n\r\nAyeyarwady River is the most important commercial waterway in Myanmar, running through the center of the country. It is about 1,534 kilometers long starting from Bhamo in Kachin State to Nyaungdon in Ayeyarwady Region. It is navigable along most of its length and all seasons. However in dry season, cargo boats need to reduce their cargo by 50% due to shallow water depth.","website":"http:\/\/dwir.gov.mm\/","project_description_myanmar":"\u1024\u1005\u102e\u1019\u1036\u1000\u102d\u1014\u103a\u1038\u1010\u103d\u1004\u103a\u1019\u1031\u102c\u103a\u1010\u1031\u102c\u103a\u101a\u102c\u1009\u103a\u1019\u103e\u1010\u103a\u1015\u102f\u1036\u1010\u1004\u103a\u1001\u103c\u1004\u103a\u1038\u104a \u1005\u1005\u103a\u1006\u1031\u1038\u1001\u103c\u1004\u103a\u1038\u1014\u103e\u1004\u1037\u103a \u101c\u102d\u102f\u1004\u103a\u1005\u1004\u103a \u1011\u102f\u1010\u103a\u1015\u1031\u1038\u1001\u103c\u1004\u103a\u1038 \u1021\u1015\u102b\u1021\u1040\u1004\u103a \u1010\u1005\u103a\u1014\u102d\u102f\u1004\u103a\u1004\u1036 \u101c\u102f\u1036\u1038\u101b\u103e\u102d Fiber Optic Network \u1000\u102d\u102f \u1021\u101e\u102f\u1036\u1038\u1015\u103c\u102f\u104d \u101e\u1010\u1004\u103a\u1038\u1021\u1001\u103b\u1000\u103a\u1021\u101c\u1000\u103a \u1005\u102e\u1019\u1036 \u1001\u1014\u1037\u103a\u1001\u103d\u1032\u1019\u103e\u102f\u1005\u1014\u1005\u103a\u1010\u1005\u103a\u1001\u102f \u1010\u100a\u103a\u1011\u1031\u102c\u1004\u103a\u1001\u103c\u1004\u103a\u1038 \u1015\u102b\u101d\u1004\u103a\u1015\u102b\u101e\u100a\u103a\u104b \u1000\u102f\u1014\u103a\u1038\u101c\u1019\u103a\u1038\u1015\u102d\u102f\u1037\u1006\u1031\u102c\u1004\u103a\u101b\u1031\u1038 \u100a\u103d\u103e\u1014\u103a\u1000\u103c\u102c\u1038\u1019\u103e\u102f \u1026\u1038\u1005\u102e\u1038\u100c\u102c\u1014\u1000 \u1021\u1000\u1031\u102c\u1004\u103a \u1021\u1011\u100a\u103a\u1016\u1031\u102c\u103a\u101e\u100a\u1037\u103a Radio Frequency Identification System(RFID) \u1010\u103d\u1004\u103a \u101c\u100a\u103a\u1038 \u1024\u1005\u1014\u1005\u103a\u101e\u100a\u103a \u1021\u1005\u102d\u1010\u103a\u1021\u1015\u102d\u102f\u1004\u103a\u1038 \u1010\u1005\u103a\u1001\u102f\u1021\u1016\u103c\u1005\u103a\u1015\u102b\u101d\u1004\u103a\u1015\u102b\u101e\u100a\u103a\u104b\r\n\r\n\u1014\u102d\u102f\u1004\u103a\u1004\u1036\u1021\u1010\u103d\u1004\u103a\u1038\u104c \u1019\u1031\u102c\u103a\u1010\u1031\u102c\u103a\u101a\u102c\u1009\u103a \u1005\u1005\u103a \u1006\u1031\u1038\u1001\u103c\u1004\u103a\u1038\u1005\u103d\u1019\u103a\u1038\u1006\u1031\u102c\u1004\u103a\u101b\u100a\u103a\u104a\u1011\u102d\u101b\u1031\u102c\u1000\u103a\u1019\u103e\u102f\u104a \u101a\u102f\u1036\u1000\u103c\u100a\u103a\u1005\u102d\u1010\u103a\u1001\u103b\u101b\u1019\u103e\u102f\u1014\u103e\u1004\u1037\u103a\u1015\u103d\u1004\u1037\u103a\u101c\u1004\u103a\u1038\u1019\u103c\u1004\u103a\u101e\u102c\u1019\u103e\u102f\u1010\u102d\u102f\u1037\u1000\u102d\u102f \u1010\u102d\u102f\u1038\u1010\u1000\u103a\u1005\u1031\u101b\u1014\u103a\u101b\u100a\u103a\u101b\u103d\u101a\u103a\u1015\u102b\u101e\u100a\u103a\u104b \u104e\u1004\u103a\u1038\u101e\u100a\u103a \u101a\u102c\u1009\u103a\u1019\u1031\u102c\u1004\u103a\u1038\u101c\u102d\u102f\u1004\u103a\u1005\u1004\u103a\u1021\u1010\u103d\u1000\u103a \u1004\u103d\u1031\u1015\u1031\u1038\u1001\u103b\u1031\u1001\u103c\u1004\u103a\u1038\u101c\u102f\u1015\u103a\u1004\u1014\u103a\u1038\u1000\u102d\u102f\u101c\u100a\u103a\u1038 \u1015\u102d\u102f\u1019\u102d\u102f \u1019\u103c\u1014\u103a\u1006\u1014\u103a\u1005\u1031\u1015\u102b\u101e\u100a\u103a\u104b","expected_outputs":"The project will provide safer, sustainable and more reliable transportation along the Ayeyarwady River. Navigation enhancements will allow vessels to pass and to be loaded more heavily during the dry season, thereby increasing efficiency of passenger and cargo transport. Other benefits include minimized loss of livelihood due to less likelihood of grounded vessels resulting from shallow water depth; increased usage of inland water transportation system; and increased trade, thereby promoting local socio-economic development.","expected_outputs_myanmar":"\u1024\u1005\u102e\u1019\u1036\u1000\u102d\u1014\u103a\u1038\u104f\u1019\u103b\u103e\u1031\u102c\u103a\u1019\u103e\u1014\u103a\u1038\u101b\u101c\u102c\u1012\u103a\u1019\u103b\u102c\u1038\u1019\u103e\u102c \u1019\u103c\u1014\u103a\u1019\u102c \u1014\u102d\u102f\u1004\u103a\u1004\u1036\u1010\u103d\u1004\u103a \u1019\u1031\u102c\u103a\u1010\u1031\u102c\u103a\u101a\u102c\u1009\u103a\u1019\u103b\u102c\u1038 \u1019\u103b\u102c\u1038\u1015\u103c\u102c\u1038 \u101c\u102c\u101e\u1031\u102c\u103a\u101c\u100a\u103a\u1038\u101c\u1031\u1011\u102f\u100a\u1005\u103a\u100a\u1019\u103a\u1038\u1019\u103e\u102f\u101c\u103b\u1031\u102c\u1037\u1001\u103b\u1014\u102d\u102f\u1004\u103a\u1001\u103c\u1004\u103a\u1038\u1014\u103e\u1004\u1037\u103a \u101a\u102c\u1009\u103a\u1019\u1010\u1031\u102c\u103a\u1010\u1006\u1019\u103e\u102f\u1019\u103b\u102c\u1038\u101c\u103b\u103e\u1031\u102c\u1037\u1001\u103b\u1001\u103c\u1004\u103a\u1038\u1010\u102d\u102f\u1037 \u1016\u103c\u1005\u103a\u1015\u102b\u101e\u100a\u103a\u104b \u1021\u1001\u103c\u102c\u1038 \u1021\u1000\u103b\u102d\u102f\u1038\u1000\u103b\u1031\u1038\u1007\u1030\u1038\u1019\u103b\u102c\u1038\u1019\u103e\u102c \u101a\u102c\u1009\u103a \u104f \u1000\u103c\u1036\u1037\u1001\u102d\u102f\u1004\u103a\u1019\u103e\u102f\u1015\u102d\u102f\u1019\u102d\u102f\u101a\u102f\u1036\u1000\u103c\u100a\u103a\u1005\u102d\u1010\u103a\u1001\u103b\u101b\u1001\u103c\u1004\u103a\u1038\u104a \u101a\u102c\u1009\u103a \u101c\u100a\u103a\u1015\u1010\u103a\u1019\u103e\u102f\u1000\u102f\u1014\u103a\u1000\u103b\u1005\u101b\u102d\u1010\u103a\u101c\u103b\u103e\u1031\u102c\u1037\u1001\u103b\u1001\u103c\u1004\u103a\u1038\u1014\u103e\u1004\u1037\u103a \u1019\u103e\u1010\u103a\u1015\u102f\u1036 \u1010\u1004\u103a\u1001\u103c\u1004\u103a\u1038\u1019\u101b\u103e\u102d\u101e\u1031\u102c\u101a\u102c\u1009\u103a\u1019\u103b\u102c\u1038\u1021\u102c\u1038 \u1021\u1005\u102d\u102f\u1038\u101b\u1019\u103e \u1005\u1005\u103a\u1006\u1031\u1038 \u1014\u102d\u102f\u1004\u103a\u1001\u103c\u1004\u103a\u1038\u1010\u102d\u102f\u1037\u1015\u102b\u1040\u1004\u103a\u101e\u100a\u103a\u104b \u1021\u103d\u1014\u103a\u101c\u102d\u102f\u1004\u103a\u1038\u1004\u103d\u1031\u1015\u1031\u1038\u1001\u103b\u1031\u1019\u103e\u102f \u1005\u1014\u1005\u103a\u101e\u100a\u103a\u101c\u100a\u103a\u1038 \u1021\u1000\u103b\u1004\u1037\u103a\u1015\u103b\u1000\u103a\u1001\u103c\u1005\u102c\u1038\u1019\u103e\u102f\u1000\u102d\u102f \u1015\u1015\u103b\u1031\u102c\u1000\u103a \u1005\u1031\u101c\u102d\u1019\u1037\u103a\u1019\u100a\u103a\u101f\u102f\u1019\u103b\u103e\u1031\u102c\u103a\u101c\u1004\u1037\u103a\u101b\u1015\u102b\u101e\u100a\u103a\u104b\r\n\r\nProgress\r\n\r\nRoD \u101c\u1000\u103a\u1019\u103e\u1010\u103a\u101b\u1031\u1038\u1011\u102d\u102f\u1038\u1001\u103d\u1004\u1037\u103a\u1000\u102d\u102f \u1042\u1040\u1042\u1040 \u1015\u103c\u100a\u1037\u103a\u1014\u103e\u1005\u103a \u1016\u1031\u1016\u1031\u102c\u103a\u101d\u102b\u101b\u102e\u101c\u1010\u103d\u1004\u103a \u1005\u102e\u1038\u1015\u103d\u102c\u1038 \u101b\u1031\u1038\u101b\u102c \u1000\u1031\u102c\u103a\u1019\u1010\u102e\u1021\u1005\u100a\u103a\u1038\u1021\u101d\u1031\u1038 \u1021\u1019\u103e\u1010\u103a \u1005\u1009\u103a (\u1042\/\u1042\u1040\u1042\u1040) \u1000\u1001\u103d\u1004\u1037\u103a\u1015\u103c\u102f\u1001\u1032\u1037\u1015\u103c\u102e\u1038 KOICA \u1014\u103e\u1004\u1037\u103a \u1000\u102f\u1014\u103a\u1038\u101c\u1019\u103a\u1038\u1015\u102d\u102f\u1037\u1006\u1031\u102c\u1004\u103a\u101b\u1031\u1038 \u100a\u103d\u103e\u1014\u103a\u1000\u103c\u102c\u1038\u1019\u103e\u102f \u1026\u1038\u1005\u102e\u1038\u100c\u102c\u1014\u1010\u102d\u102f\u1037\u101e\u100a\u103a RoD \u1000\u102d\u102f \u1042\u1040.\u1043.\u1042\u1040\u1042\u1040 \u101b\u1000\u103a\u1014\u1031\u1037\u1010\u103d\u1004\u103a \u101c\u1000\u103a\u1019\u103e\u1010\u103a\u101b\u1031\u1038\u1011\u102d\u102f\u1038\u1001\u1032\u1037\u1000\u103c \u1015\u102b\u101e\u100a\u103a\u104b","project_status":"Implementation","start_fiscal_year":"FY2019-2020","funding_sources":"Public Domestic Financing","financing_information":"2nd year of six-year project. Budgeted approximately 3.8 millions USD in 2019-2020.","tender_date":"0000-00-00","developer_name":"","implementing_agency":"Directorate of Water Resources and Improvement of River Systems","implementing_agency_myanmar":"\u101b\u1031\u1021\u101b\u1004\u103a\u1038\u1021\u1019\u103c\u1005\u103a\u1014\u103e\u1004\u1037\u103a \u1019\u103c\u1005\u103a\u1001\u103b\u1031\u102c\u1004\u103a\u1038\u1019\u103b\u102c\u1038 \u1016\u103d\u1036\u1037\u1016\u103c\u102d\u102f\u1038\u1010\u102d\u102f\u1038\u1010\u1000\u103a\u101b\u1031\u1038\u1026\u1038\u1005\u102e\u1038\u100c\u102c\u1014, \u1015\u102d\u102f\u1037\u1006\u1031\u102c\u1004\u103a\u101b\u1031\u1038\u1014\u103e\u1004\u1037\u103a \u1006\u1000\u103a\u101e\u103d\u101a\u103a\u101b\u1031\u1038\u101d\u1014\u103a\u1000\u103c\u102e\u1038\u100c\u102c\u1014","ministry":"Ministry of Transport and Communications","project_location":"Ayeyarwady Region; Kachin State","project_location_myanmar":"\u1017\u1014\u103a\u1038\u1019\u1031\u102c\u103a, \u1000\u1001\u103b\u1004\u103a\u1015\u103c\u100a\u103a\u1014\u101a\u103a\r\n\u100a\u1031\u102c\u1004\u103a\u1010\u102f\u1014\u103a\u1038, \u1027\u101b\u102c\u101d\u1010\u102e\u1010\u102d\u102f\u1004\u103a\u1038\u1012\u1031\u101e\u1000\u103c\u102e\u1038","townships":"Bhamo Township; Nyaungdon Township","townships_myanmar":"\u1017\u1014\u103a\u1038\u1019\u1031\u102c\u103a,\u100a\u1031\u102c\u1004\u103a\u1010\u102f\u1014\u103a\u1038,","sector_categories":"","sectors":"","msdp_alignment":"3.4: Further reform our trade sector and strengthen regional and international cooperation and linkages; 3.6: Build a priority infrastructure base that facilitates sustainable growth and economic diversification; 5.2: Increase climate change resilience, reduce exposure to disasters and shocks while protecting livelihoods, and facilitate a shift to a low-carbon growth pathway; 3.1: Create an enabling environment which supports a diverse and productive economy through inclusive agricultural, aquacultural and polycultural practices as a foundation for poverty reduction in rural areas; 3.3: Provide a secure, conducive investment enabling environment which eases the cost of doing business, boosts investor confidence and increases efficiencies","national_policies":"","national_strategies_and_objectives":"","sdgs_goals":"","state_and_international_cooperation_frameworks":"","goal_1_old_project":"","goal_2_old_project":"","goal_3_old_project":"3.1: Create an enabling environment which supports a diverse and productive economy through inclusive agricultural, aquacultural and polycultural practices as a foundation for poverty reduction in rural areas; 3.3: Provide a secure, conducive investment enabling environment which eases the cost of doing business, boosts investor confidence and increases efficiencies 3.4: Further reform our trade sector and strengthen regional and international cooperation and linkages; 3.6: Build a priority infrastructure base that facilitates sustainable growth and economic diversification;","goal_4_old_project":"","goal_5_old_project":"5.2: Increase climate change resilience, reduce exposure to disasters and shocks while protecting livelihoods, and facilitate a shift to a low-carbon growth pathway;","_links":{"self":[{"href":"https:\/\/www.projectbank.gov.mm\/my\/wp-json\/wp\/v2\/project_proposal\/1094","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.projectbank.gov.mm\/my\/wp-json\/wp\/v2\/project_proposal"}],"about":[{"href":"https:\/\/www.projectbank.gov.mm\/my\/wp-json\/wp\/v2\/types\/project_proposal"}],"version-history":[{"count":1,"href":"https:\/\/www.projectbank.gov.mm\/my\/wp-json\/wp\/v2\/project_proposal\/1094\/revisions"}],"predecessor-version":[{"id":1098,"href":"https:\/\/www.projectbank.gov.mm\/my\/wp-json\/wp\/v2\/project_proposal\/1094\/revisions\/1098"}],"wp:attachment":[{"href":"https:\/\/www.projectbank.gov.mm\/my\/wp-json\/wp\/v2\/media?parent=1094"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.projectbank.gov.mm\/my\/wp-json\/wp\/v2\/categories?post=1094"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.projectbank.gov.mm\/my\/wp-json\/wp\/v2\/tags?post=1094"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}